A southbound load leaves the junction and prepares to roll into Two Harbors.
DMIR 418 northbound at Gilbert.
DMIR 418 northbound at Wyman with empties.
DMIR 418 and 416 sit together, the only two SD45-2 rebuilds on the system
Escanaba loads at South Steelton.
Empty
Kicking up some of the 2+ feet of snow received this week north of Two Harbors.
Southbound with 116 ore loads.
DMIR 418 (with an SD45-2 body, one of two on the railroad) leads an SD38 north out of Proctor on the bi-weekly Miscelleanous Road Freight.
A Proctor Roadswitch works the Lakehead Storage Facility.